Is a rush order worth it for a grand opening?

Example thread · fictional members and dates What does this mean?

Viewing 17 posts - 1 through 17 (of 17 total)
  • Author
    Posts
  • #5585
    BikeShop_Boise
    Participant

    Second location news: we’re opening a rental and repair shack by the river trail, with the grand opening on the first Saturday in May. I want printed mats on the counter for opening day with the new logo. I’m a planner now, after last year.

    Except the new logo isn’t final. The designer is on round three. So here’s my question. If the art is late, is it worth paying for a rush, or should I open without mats and add them later?

    #5586
    EventMktg_SanJose
    Participant

    I live in this question. Six trade shows a year, and the art is always late. Work backward from the date. Write down the day you want mats on the counter, then shipping time, then production, then the proof, then the day the art must be final. That last date is the real deadline, and it’s usually earlier than people think.

    #5587
    BikeShop_Boise
    Participant

    OK. Opening is the first Saturday in May. I’d want mats a week before, so I’m not panicking the night before.

    #5588
    EventMktg_SanJose
    Participant

    A week of buffer is smart. Now ask any printer for their standard turnaround after proof approval and their rush option, and write both under your date. Then compare the “art final” date for each. If your designer can comfortably hit the standard date, you don’t need the rush.

    #5589
    Deli_Owner_Queens
    Participant

    From someone who opened two shops: opening week is chaos. The plumber, the health inspection, the register that won’t talk to the card reader. The mats were the last thing anybody thought about. I’d get them out of the way early so they’re not one more thing in a week when everything breaks.

    At my second place I made a list of everything with my logo on it: the sign, the menu boards, the cups, the mats, the aprons. Each item got its own “art final” date. The mats were the easiest one once they had a date. Before that, they were the one I kept pushing to next week.

    #5590
    BikeShop_Boise
    Participant

    The register thing is already happening in my head, and the shack doesn’t even have power yet.

    #5591
    EventMktg_SanJose
    Participant

    On whether a rush is worth it, compare the rush cost to the cost of not having the mats. For a trade show, no mats means a bare table in a booth that took months to plan, so we pay for the rush without a second thought. For a shop opening, ask what a mat does on day one. If it carries the opening offer, it matters. If it’s only the logo, it can come a week later and nobody will know.

    There’s a third option people forget: open with something simple and swap later. A plain mat with a printed paper sheet on day one, and the finished mats when they’re ready. Customers at an opening look at the bikes and the free coffee, not at the counter.

    #5592
    CounterMats Team
    Moderator

    Working backward from the opening date, as EventMktg_SanJose describes, is the right way to plan this. Put these steps under your date for a printed order.

    Every printed order gets a free digital proof within 1 business day. Printed orders ship 5 business days after proof approval, for orders up to 2,500 mats. A 3-business-day rush is available on most printed orders; ask for the rush cost with your quote. Larger orders ship free by ground to the lower 48 states. The minimum order is 50 mats.

    So the artwork deadline is the date that decides whether you need the rush. Our turnaround page shows where the time goes: artwork readiness is the biggest variable, proofing takes longer than people expect, the printing itself is usually the fast part, and shipping is the stage people forget to ask about: https://countermats.com/custom-counter-mats-turnaround/

    If the logo slips, our stock mats ship the same business day on orders placed by 1 pm ET, and the Stock Interchangeable mat in 10.5 x 13 in holds an 8.5 x 11 insert you can print yourself: https://countermats.com/product/stock-interchangeable/

    CounterMats Team · Contact Us

    #5593
    BikeShop_Boise
    Participant

    So if the logo is final by mid-April, standard timing works with room to spare. If it slips to the last week of April, the rush covers it. And if it slips past that, an insert mat with the logo printed on paper buys me time until the real ones are done.

    #5594
    Deli_Owner_Queens
    Participant

    That’s a real plan. Write it on the wall in the back room. In opening week, nobody remembers anything they didn’t write down.

    #5595
    EventMktg_SanJose
    Participant

    Also put a hard date on the designer. “Final by April 10”, in writing. Designers are great, but round six happens when nobody sets a stop.

    #5596
    BikeShop_Boise
    Participant

    Round three already feels like a lot. I’ll send the designer the date tonight, with the reason, so it doesn’t feel random.

    #5597
    Deli_Owner_Queens
    Participant

    And approve the proof the same day it comes in. At my second opening, the proof sat in my inbox for four days because I thought it was a delivery notice. Four days I didn’t have. Now I tell whoever sends the proof to text me as well, because a text I see in a minute and an email I see whenever.

    #5598
    EventMktg_SanJose
    Participant

    Same story here, once. I set a mail filter now so anything with “proof” in the subject goes to the top. It sounds silly, and it has saved a show at least twice.

    #5599
    BikeShop_Boise
    Participant

    Final plan for the record. Logo final by April 10. Quote request the same week, with sizes and how many counters. Proof approved the day it comes in. Mats on the counter the last week of April. Rush only if the logo slips, insert mats as the backup, and a filter for “proof” in my email.

    #5600
    Deli_Owner_Queens
    Participant

    Good luck with the opening. Put a mat by the air pump too. Everybody stands there and waits for their tires.

    #5601
    BikeShop_Boise
    Participant

    The air pump spot is a good idea. That’s where people stand around talking about routes, so the mat there gets the trail map and the rental hours instead of the logo. I’ll report back after opening day on what actually got done on time, and what I’d do differently for the next opening.

Viewing 17 posts - 1 through 17 (of 17 total)
  • Log in or create an account to post. Anyone can read.

Log in

Forgot your password?

Join the Counter Mat Forum

Everyone sees this. A role works well instead of your name, for example CStore_Owner_Ohio.

Members, discussions and dates in threads marked Example thread are fictional. CounterMats wrote them to explain common counter mat questions in plain language.

Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.